Stop Renting Power.
Start Owning It.
Slash your electricity bills by up to 90% with MAQO Solar. Join hundreds of Klang Valley homeowners securing their energy independence under the new government quota.
Why Waiting for 2027 is a Mistake
The 2026 Solar ATAP quota is released on a "first-come, first-served" basis. Once the gigawatt capacity is filled, new approvals pause. Don't let your application get stuck in the backlog.
- Agile 2026 Quota ApprovalsPriority submission to SEDA to lock in your slot.
- BESS-Ready TechnologyOur systems are battery-ready for future blackout protection.
- End-to-End PaperworkWe manage all TNB, SEDA, and GTM submissions for you.
Why Homeowners Choose MAQO
We deliver enterprise-grade reliability with the speed and personal attention of a boutique specialist. Disclaimer: Comparison based on internal benchmarks and publicly available installer criteria.
| Feature | MAQO SOLAR | Public Installers |
|---|---|---|
| Proposal Speed Time to get your ROI analysis | 24 Hours Guarantee | 3 - 7 Days |
| System Technology Inverter capabilities | BESS (Battery) Ready | Standard Inverter |
| Paperwork Handling SEDA & TNB submissions | 100% Done-For-You | Often Outsourced |
| 2026 Quota Agility Application submission speed | Priority Lane | × Standard Queue |
3 Simple Steps to Savings
Free Analysis
We assess your home and bills to provide a clear cost-vs-savings breakdown within 24 hours.
Install & Approval
We handle sourcing, electrical works, grid connection, and all TNB/SEDA approvals.
Save & Monitor
We monitor performance to ensure maximum output. You just enjoy the lower bills.
Clean Installation Guarantee
Watch how our team protects your roof and ensures a neat, hidden-wire installation.
Latest Installations in Klang Valley
(Click images to enlarge)
Zero Bill Results
"Installation was smooth, and savings started immediately. Our TNB bill dropped from RM 900 to RM 420."

Shah Alam (Bungalow)
"MAQO Solar handled everything. No paperwork, no stress. Highly recommended."

Petaling Jaya (Terrace)
"Great service and professional team. The BESS ready system gives me peace of mind."

Klang (Semi-D)
Frequently Asked Questions
Malaysia’s new rooftop solar initiative launching Dec 2025, replacing NEM and allowing you to offset up to your full usage.
Typical residential systems range from RM15,000 to RM45,000 depending on your roof size and energy needs. ROI is typically 4-6 years.
Yes — by using most of your own solar power during the day, you still enjoy significant bill reductions and fast ROI.
Absolutely. Our team manages all submissions (NEM/ATAP), meter changes, and testing for you.
Optional. Most homeowners start with a grid-tied system. Batteries (BESS) can be added later for blackout protection.
Performance warranty is 25 years. Product warranty for panels/inverters is typically 10-15 years.
Yes — we offer zero-interest installment plans with major banks.
Check Your 2026 Eligibility
See how much you can save under the new ATAP Government-approved scheme.
No obligation. 100% Free Analysis.